P.O. Box

PO Box 226 Newburyport, MA 01950

Email Us

PlumIslandFoundation@gmail.com

Plum Island Foundation

10-31-2022 press conference at Reservation Terrace

Flood Insurance news

Flood Insurance: FEMA Risk Rating 2.0Whether or not you have flood insurance, you need to know about FEMA Risk Rating 2.0 which went live on …

Surprise Donation!

Imagine my face when I opened the attached letter from The Hive, a 4th grade class at Spofford Pond School in Boxford. The class learned …

1/22/21 USACE announces Merrimack & Piscataqua dredges.

Merrimack dredge to place sand at Reservation Terrace.  Piscataqua dredge sand to be placed near shore off Plum Island & Salisbury. Read Full Disclosure Here

1/25/21 Reservation Terrace press conference.

Plum Island Foundation helps bring leaders and media to address emergency situation at Reservation Terrace. Read Full Disclosure Here

Jan ’21 DCR Sediment Management Study.

Extensive scientific study of erosion hotspots at Reservation Terrace, Center Island & Salisbury including recommended mitigation options. Download Full Report Here

3-24-21 Mass EEA

3-24-21 Mass EEA commits to support Piscataqua sand purchase. Read Full Disclosure Here

2010 Beach Nourishment

USACE dredged the Merrimack River and placed over 220,000 cubic yards in front of 26 homes from Center Island going North Our first project was …

South & North Jetty Repairs 2012-5

The North & South jetties had last been repaired by the USACE @1970. By 2011, both jetties were structurally compromised creating navigational risks and risks …

Sand Placement and Dune Grass Planting at Reservation Terrace 2018-9

Worked with local residents to raise funds and get approvals to nourish the eroding dunes and plant dunegrass.

Scroll to Top